Call Us At (800) 798-8471
Home > Case Studies > Multi-Photo Case Study

Multi-Photo Case Study

John Deere

Project
Company's existing hot lime softening system was becoming very unreliable. Continuous softened water was instrumental to their business process. High quality water was also needed to ensure their paint operation section ran uninterrupted.

Solution
Hausers Water designed and installed both a combined equipment pre-treatment and final solution stage system to meet their processing needs.

Products Used
40 GPM RO system (See Photo 1).
Pre-treatment system (See Photo 2).

 Photo 1 Photo 2

40 GPM RO System


Website designed by
JLConsulting Web Services, LLC